It has become standard for steel fibres to be used in tunnel construction for temporary and permanent supports. For the Eastlink tunnel Reoco 65/35 steel fibre reinforced shotcrete was used in the temporary support structure as well as the final lining which consisted of a hybrid precast/cast in-situ watertight lining to prevent drawdown of the water table and maintain environmental water flows to the creek.
– Excellent durability, energy absorption and crack control
– Better adhesion of shotcrete to the substrate – no debonding
– Speed of construction / labour and material savings
– Safety – with ReoCo 65/35 steel fibre reinforced shotcrete, there is no need to hand mesh during
excavation which can be dangerous.